top of page
Photo 14-9-2023, 12 31 34 PM.jpg

Brisbane Green Bridge

The Breakfast Creek / Yowoggera Bridge and Lores Bonney Riverwalk extension is now open, providing an enhanced active transport link between the inner city and northern suburbs.

CSD Group played a crucial role in the construction of the bridge by laser scanning and verifying the fabrication of each individual part in the workshop and during initial construction at the Port of Brisbane.

 

This ensured precision construction on site with laser guided erection and real-time QA of members.

 

Additionally, CSD managed BIM collaboration between the temporary towers, site surveyors, and engineering elements, ensuring seamless coordination throughout the project.

bottom of page